How to read a recorded plat for setback lines before a site visit

A recorded plat is the legal description of a subdivision, showing lot lines, block numbers, easements, and often the building setback lines the developer dedicated when the plat was filed. A site plan is the document the applicant submitted for this specific permit, showing where they propose to put the structure relative to those same lines. Pull both before you leave the office. They answer different questions, and a mismatch between them is usually the first sign something's off.
Finding the setback lines on the plat itself
Setback lines on a recorded plat usually show up as a dashed or dash-dot line running parallel to the front, side, and rear lot lines, set back from the property boundary by a labeled distance. Look in the legend first. Plats drawn before the 1990s sometimes bury the setback note in a block of text near the certification stamp rather than drawing the line at all, so check both places before deciding the plat doesn't address it.
The distances on the plat are the ones the subdivider recorded at the time of filing. Your current zoning ordinance may call for something different today. A plat from 1978 might show a 25-foot front setback while your zoning code today calls for 20. The plat line still matters because it's recorded against the land and can be more restrictive than the code, and more restrictive controls. Note the recording date and compare it against any zoning text amendments or subdivision regulations that have changed since.
Also check whether the plat carries a blanket utility easement along the rear or side line. A 10-foot PUE running inside the setback is common, and it's a separate restriction from the setback itself. A structure can clear the setback line and still encroach on the easement.
Recorded plat vs. site plan: what each one is for
The plat is fixed. Once recorded, it doesn't change unless someone files a replat or a vacation of easement through the plat process. The site plan is the applicant's proposal for this permit cycle: foundation footprint, proposed height, and the setback dimensions they claim they're meeting, drawn against the plat's lot lines.
When you compare the two, you're checking that the site plan's claimed setback lands outside the plat's recorded setback line, the line that matters here, rather than simply clearing the property boundary. A plan can show a structure sitting legally inside the lot boundary and still violate the plat's setback by several feet, because the setback line runs several feet inside the boundary rather than along it.
If the site plan shows setback distances that don't match what's on the recorded plat, that's worth a phone call to the applicant's surveyor before you schedule anything, not after.
Pulling the dimensions you'll use in the field
Before a site visit, write down four numbers off the plat: front setback, side setback (both sides if they differ), rear setback, and any easement width that overlaps those lines. Note which lot line each distance runs from, since some plats measure from the right-of-way line rather than the platted lot line, and those aren't always the same point.
Bring the bearing and distance calls for the lot corners too. A tape measure and a rough pace count from a visible monument can tell you in the field whether a foundation is sitting close to a line worth flagging for a full survey, even though it won't give you a surveyed answer.
What the plat won't tell you
A recorded plat tells you where the line is supposed to be. It won't tell you where the foundation actually sits, what the structure's height is relative to grade, or whether a footprint drifted past the envelope sometime between your last inspection and now. That's a site visit's job, and for a lot of jurisdictions it's still the only way those get caught: a neighbor complains, and someone goes out to look. A quarterly pass that checks footprint, height, and setback against the permitted envelope for every active file, instead of waiting on a complaint, is the offer behind Permit Compliance.
If the paperwork review raises more questions than it answers, that's a sign the plat and the site plan were never reconciled at the counter. Worth fixing before the visit, not during it.