Blog
Nov 16, 2026
Field notes: the dormer that added four feet nobody noticedA shed dormer crept past the ridge height limit for three years before anyone caught it. Here's why that gap exists and how a quarterly pass closes it.
Nov 16, 2026
Comparing a stamped site plan to a 3D as-built model for footprint checksHow to line up a stamped site plan against a 3D as-built model to check footprint, setback and height without a site visit for every permit.
Nov 9, 2026
How to read a recorded plat for setback lines before a site visitPulling setback distances off a recorded plat before you drive out, and why a plat and a site plan aren't the same document.
Nov 9, 2026
What is a zoning compliance letter, and when does an applicant need one?A plain-language breakdown of the zoning compliance letter: what it certifies, who asks for it, and what the office needs to check before signing one.
Nov 2, 2026
Field notes: the second story nobody filed a permit forField notes on how a permitted deck becomes an unpermitted second story, and why the roofline change shows up in VHR imagery long before the neighbor complaint.
Nov 2, 2026
Quarterly audit pass vs. complaint-driven enforcement: which one catches unpermitted workComplaint-driven enforcement only catches what a neighbour reports. A quarterly audit pass checks every permit against the built structure on a fixed cycle.
Oct 26, 2026
How to verify a fence height against an approved site planHow to verify fence height against an approved site plan, and why VHR imagery works for accessory structures but not fence lines.
Oct 26, 2026
FAR vs. lot coverage: two numbers enforcement keeps mixing upFloor area ratio and lot coverage measure different things. Here's how to tell them apart and calculate FAR for a permit compliance review.
Oct 19, 2026
Field notes: the garage that crept past the line, three inches a quarterA detached garage inched past its setback a few inches at a time. No complaint ever flagged it. Here's how the drift got caught.
Oct 19, 2026
Daylight plane rules: what they are and why they cap building heightA plain explanation of daylight plane zoning rules, how they interact with setbacks, and why the built envelope is hard to verify after framing goes up.
Oct 14, 2026
What is a stop-work order, and when does a building department issue one?A plain explanation of what a stop-work order is, the conditions that trigger one, and how it fits alongside other building code enforcement actions.
Oct 14, 2026
What is grandfathering in zoning code enforcement?A plain-language look at how grandfathering works in zoning enforcement, how it differs from a variance, and where it stops protecting a structure.
Oct 13, 2026
As-built deviation vs. survey error: how to tell them apartA footprint mismatch against the permit drawing isn't always a build problem. Here's how to sort real deviation from imagery and survey noise.
Oct 13, 2026
What a zoning variance changes in a permitted building envelopeA plain explanation of zoning variances, setback relief and how a granted variance redraws the permitted envelope you're enforcing against.
Oct 7, 2026
How to measure building height from aerial imagery without a survey crewHow ridge height gets measured from aerial and satellite imagery using stereo models, and where that method holds up against a ground survey.
Oct 7, 2026
Non-conforming structure vs. code violation: what's the differenceA field guide to telling a legal nonconforming use from an active code violation, and why the file matters more than the eye test.
Oct 7, 2026
Setback rules for sheds, garages and pools: what actually variesA plain-language breakdown of how accessory structure setbacks work for sheds, detached garages and pools, and why the numbers shift by jurisdiction.
Oct 7, 2026
What counts as gross floor area under a zoning codeA field guide to what counts as gross floor area under a zoning code, what gets excluded, and where FAR calculations commonly go wrong.